Pasir Panjang Pillbox is situated 790 metres northeast of Singapore Container Terminal. Some of the new port technologies, such as driverless or automated guided vehicles, are being tested and used at the newer facilities at the Pasir Panjang Terminal. Soon Pasir Panjang quay began operations, and in 1972 The Tanjong Pagar Container Terminal was established along with three container berths. In the same year, on June 24, the first container ship arrived at the port – M.V.Nihon. The transfer of 500 staff to Pasir Panjang Terminal, which involved the port unions, is complete, said a PSA corporate spokesman. Pasir Panjang Pillbox is a strengthened-concrete defensive structure from WWII, located in Pasir Panjang in the southwestern area of Singapore. Shot in 2016. Location details. Singapore opened the newest addition to its container port on Tuesday, aiming to handle more of the increasing number of mega-ships plying the oceans. Aerial panorama of the Singapore Strait and the Pasir Panjang Port Terminal. In terms of cargo tonnage, Singapore is behind Shanghai with 423 million freight tons handled. Location of PASIR PANJANG CONTAINER TERMINAL (N 1° 16' 11.8452", E 103° 47' 46.0572") on the map. To construct Pasir Panjang Terminal Phases 3 & 4, some 198ha of land (equivalent to 280 football fields) was reclaimed off the Pasir Panjang shore. He began his career at PSA as a cargo driver in 2010, and rose through the ranks to mentor new drivers before he joined the team operating automated cranes last July. Pasir Panjang Pillbox is situated 2 km north of Pasir Panjang Container Terminal. Pasir Panjang Terminal, Singapore: report as inaccurate! 65m The port is the world's busiest port in terms of shipping tonnage handled, with 1.15 billion gross tons (GT) handled in 2005. Mr Juraimi Abdul Kadir, 35, supervises a team of crane specialists at Pasir Panjang Terminal Building 3. Pasir Panjang Pillbox is a strengthened-concrete defensive structure from WWII, located in Pasir Panjang in the southwestern area of Singapore. updated: 15 jun 2020 1 pasir panjang terminal berth depth a/s (m) approach depth(m) max loa (m) remarks p01 15.0 15.0 - p02 15.0 15.0 - A general view of the construction site of new berths at the Pasir Panjang Terminal Phases 3 and 4 in Singapore June 23, 2015. business opportunities: Anvil Engineering Pte Ltd 1.1km, frame pte ltd 1.4km, PM Control Systems Pte Ltd 1.5km, Chemicals for Oilfield, Marine, Water and Fuel.